Thank you, Mr. Speaker. Mr. Speaker, remaining work under OROGO order includes gas mitigation testing on 24 wells. Upon conclusion of the fire season, cut and cap four wells that require gas mitigation testing and removal of pipeline segment attached to two quad bridges, removal of bridges, a culvert, and main camp buildings.
All this may have been impacted by the fire over the summer. Removal of the intergovernmental -- or sorry, interprovincial pipelines. However, the Canadian energy regulator has -- does not want it removed yet. Conduct phase 2 environmental assessment -- site assessment and ground truth inventory environmental liabilities remain at the sites, such as contaminated soil, sumps, and site infrastructure. Thank you, Mr. Speaker.