Once again, when I get that information for the Member about all of the projects that are underway, the Member will see we have done a number of briefings. But we have done a fairly good job in terms of retrofitting our buildings. The Tuk project is moving along. They are trying to fast-track the mini-hydro in Lutselkāe. There is work being done on extending the power lines. We have made fairly significant efforts with biomass, as well, in other areas, with recovering waste heat up the valley. There is a very important piece of work being done for geothermal for both in Yellowknife and in Fort Liard. I think, when you consider what we are trying to do in terms of the structural change of our system, how we generate, distribute and use energy to reduce our greenhouse gases and to reduce our carbon footprint and our reliance on diesel, I think, given the fact that we are now into year two and we have come from basically a standing stop, that we are doing a fairly good job. Thank you.
Michael Miltenberger on Question 148-16(5): Green Energy Initiatives
In the Legislative Assembly on May 17th, 2010. See this statement in context.
Question 148-16(5): Green Energy Initiatives
Oral Questions
May 16th, 2010
See context to find out what was said next.